According to Tokyo Electric Power Company, the Fukushima Daiichi Nuclear Power Station resumed treated water discharge operations on June 11, after a system alert caused an automatic halt the previous day. The alert was triggered during treated water transfer operations on June 10 at 4 p.m. local time (3 p.m. Beijing time).
免责声明:本页面信息可能来自第三方,仅供参考,不代表 Gate 的观点或意见,亦不构成任何财务、投资或法律建议。数字资产交易风险较高,请勿仅依赖本页面信息作出决策。具体内容详见
声明。